Skip to content
schoolconstructionnews_logo

School Construction News

Design – Construction – Operations

  • Articles
    • Featured Articles
    • News Articles
    • Products
    • People
  • Advertising
  • Subscribe
  • About
    • Contact
    • About School Construction News
    • Resource Guide
  • Events
  • Industry Thought Leaders
    • Editorial Advisory Board
  • Submit Content
  • Home
  • arizona-state-university

Latest Posts

  • Kristin Dufek to Lead EUA July 28, 2025
  • HVAC Efficiency Tool July 28, 2025
  • Building Accessibility and Inclusivity into Playspaces July 24, 2025
  • EDmarket Launches Design for Learning Co-Lab to Transform Educational Environments July 23, 2025
  • Steel Facade Solution July 21, 2025
  • Conrad Hertz Elected to RMF Engineering Board July 21, 2025
  • Stacy Roth Joins DLR Group July 14, 2025
  • Emily Drake Appointed to New Role at Wells July 14, 2025
  • Indoor Athletic Surfacing July 14, 2025
  • Sustainable Acoustic Panel July 14, 2025

arizona-state-university

Feature.ScienceBuildingASU
  • Featured Articles

Major Science Building Project Tops Out at ASU

11 months ago11 months ago5 mins

Designer SmithGroup and general contractor McCarthy Building Companies have reached a construction milestone on the $185 million Interdisciplinary Science and Technology Building 12 (ISTB12) at Arizona State University’s (ASU) Polytechnic campus, located in the eastern Phoenix neighborhood of Mesa.

Read More
  • Featured Articles

New ASU Science Building Designed for LEED Platinum

5 years ago4 years ago6 mins

A major construction milestone was achieved recently with the topping out on the new $192 million Interdisciplinary Science and Technology Building 7 (ISTB7) project at Arizona State University (ASU) in Tempe.

Read More
  • Featured Articles

Arizona State Breaks Ground on Multipurpose Tower

5 years ago5 years ago7 mins

In partnership with Arizona State University (ASU), established architecture, and planning firm Studio Ma has announced the groundbreaking of the new ASU Downtown Phoenix Residence Hall and Entrepreneurial Center, a 16-floor residential tower with academic and interdisciplinary facilities.

Read More
  • Featured Articles

ASU Moves into Final Phases of Sun Devil Stadium Construction

8 years ago7 years ago5 mins

Last fall, Hunt-Sundt completed the 490,000-square-foot Phase II renovation of Arizona State University’s Sun Devil Stadium.

Read More

Digital Edition

SCN News May/June Digital Edition

Digital Edition of the Month
Subscribe
Archives

Sponsored Video

Our Markets

About Us

Since 1998, School Construction News has been the news magazine devoted specifically to educational facility construction and operations. Readers include several segments of the “building team” including school administrators, facility managers, school board members as well as architects, contractors and suppliers in the field. Special attention is paid to the maintenance/operations and design/construction segments.

Contact Us

  • Sales
  • Editorial
  • Circulation and Billing

Useful Links

  • Subscribe
  • Linkedin

Copyright © 2025 School Construction News. All rights reserved.